Things that need done across the buildings and lot
| Entered | Task | Building | Status | Entered By | Actions |
|---|---|---|---|---|---|
| 2026-07-03 | Rear shop door need replaced Dewey French informed | East | JC | ||
| 2026-07-02 | Paint electrical panel area of main building | Main | mh | ||
| 2026-07-02 | Crank Out windows in west showroom are rotten | East | MC | ||
| 2026-07-03 | Walk out door in shop needs replaced. Dewey French informed 7/3/2026 Dewey french measured door Casey. | Main | BW | ||
| 2026-07-03 | Rear shop door needs replaced at back of shop 7/3/2026 Dewey French measured door Casey | Main | Bw |
Entered2026-07-03
TaskRear shop door need replaced Dewey French informed
BuildingEast
Status
Entered ByJC
Entered2026-07-02
TaskPaint electrical panel area of main building
BuildingMain
Status
Entered Bymh
Entered2026-07-02
TaskCrank Out windows in west showroom are rotten
BuildingEast
Status
Entered ByMC
Entered2026-07-03
TaskWalk out door in shop needs replaced. Dewey French informed 7/3/2026 Dewey french measured door Casey.
BuildingMain
Status
Entered ByBW
Entered2026-07-03
TaskRear shop door needs replaced at back of shop 7/3/2026 Dewey French measured door Casey
BuildingMain
Status
Entered ByBw